日韩欧美大片一区二区三区,亚洲AV日韩精品一区二区不卡,亚洲美女精品视频,无码一区二区91视频红桃视频,99热这里只有精品免费热,亚洲国产欧美在线观看视频

Cn

Precautions for cement sleepers during transportation
Source:Qufu Juli Release Date:2020-9-19
Read:11

Precautions for transporting cement sleepers: 1. Railway cement sleepers should be transported on highways using vehicles with fixed frames, and the transport vehicles should be compatible with the size of the sleepers

Precautions for transporting cement sleepers:


1. The transportation of railway cement sleepers on highways should use vehicles with fixed frames. The transport vehicles should be compatible with the size of the sleepers, and the number of layers loaded should not exceed 6. After loading, they should be securely tied to prevent displacement during transportation.


2. Railway cement sleepers for railway transportation should be loaded according to the approved loading plan by the railway department.


3. When loading, insert two triangular wedges between each stack of sleepers to prevent collisions and damage during transportation.


4. The transportation of railway cement sleepers shall comply with the following regulations: (1) 4 people shall be responsible for lifting each concrete sleeper; Bridge sleepers, switch sleepers, etc. should have more lifting personnel; (2) When lifting railway sleepers, the hanging sleepers should be secure, the lifting should be smooth, and the steps should be consistent when placing them; (3) A single person carrying a wooden pillow should have a fixed person shoulder it and then put it down, without shrugging or throwing it, to avoid colliding with others.


5. When unloading railway cement sleepers, it is strictly prohibited to touch, collide, drop, or twist them to avoid endangering equipment and personal safety.


水泥軌枕在運輸過程中需要注意的事項